Measure. Record. Plan the replacement.

Fire Door Replacement Surveys

Measured fire door replacement surveys recording openings, door configurations and site constraints to support specification, quotations and installation planning.

Genuine MC Pro work · illustrative service contextReplacement surveys

Clear information for the work ahead.

Replacement works run more smoothly when the site information is clear before procurement. We record the agreed opening and doorset measurements, handing, configuration, visible interfaces and access constraints. The survey supports the appointed designer, supplier and contractor in preparing the replacement package; product selection and performance requirements follow the approved fire strategy and manufacturer information.

What the service can include

  • Location references and agreed opening or doorset measurements
  • Door configuration, handing, swing and available clearance
  • Existing glazing, ironmongery, access-control and finish requirements for review
  • Visible wall, frame, threshold and perimeter-interface conditions
  • Removal, making-good, access and occupied-building constraints
  • Photographs, measurement limitations and items requiring further investigation

The intended outcome

A measured schedule and photographic record to support a replacement quotation, procurement review and practical installation plan, with unresolved details identified before ordering.

Need a different starting point? Explore our condition and remedial surveys, measured replacement surveys, or remedial works. Survey findings and the subsequent works are scoped and quoted separately.

Request a replacement survey quotation

Share the proposed replacement programme and any information already agreed with your designer or supplier.

  • Site postcode, building type, door quantities and single or double configurations.
  • The measurement brief, supplier requirements and any approved replacement specification.
  • Known access-control, glazing, finish, threshold and surrounding-wall requirements.
  • Access restrictions, opening-up requirements, target programme and schedule format.

Accessible measurements and visible conditions are recorded to the agreed brief. Concealed dimensions and interfaces may require separately authorised opening-up. Final manufacturing dimensions and product suitability must be confirmed through the approved supplier and design route before ordering. The survey does not provide product certification or replace the project fire strategy.

See our approach to quality checks and project records, or send your project details for review.

Quality evidence

Work follows the project information—not assumptions.

Where information is missing or a condition falls outside the agreed detail, it is raised with the project team before the work is closed out.

Understand the England regulatory context
01

An agreed measurement brief and schedule format

02

The project fire strategy and approved performance requirements

03

Supplier requirements for manufacturing dimensions and final measurement checks

04

Recorded access constraints, visible interfaces and outstanding technical decisions

Project enquiries

Planning replacement surveys?

Share the scope, site location, door quantities and programme. We’ll review the delivery requirements and respond with the next practical questions.